Work Package Description

Print

 

This Section presents Facies's WorkPackages:

 

WP100

 

  • Task 101       Activity 1 Management

properly manage the project according to the CIPS rule and the planned list of tasks

 

WP200

 

  • Task 201       Activity 1 Probabilistic Methodologies

take into account the state of the art of probabilistic modeling methodologies for  Interdependnet critical Infrastructures

 

  • Task 201       Activity 2 Topological Methodologies

take into account the state of the art of topological modeling methodologies for  Interdependnet critical Infrastructures

 

  • Task 201       Activity 3 Input-Output Methodologies

take into account the state of the art of input-output modeling methodologies for  Interdependnet critical Infrastructures

 

  • Task 202      Activity 1 Qualitative Interdependency Metrics

take into account the most diffused qualitative metrics for the evaluation of interdependency

 

  • Task 202       Activity 2 Quantitative Interdependency Metrics

take into account the most diffused quantitative metrics for the evaluation of interdependency

 

  • Task 203       Activity 1 Methodology Scoring

identify the most promising methodologies to describe and inspect the bahavior of critical infrastructures, based on the metrics and with respect to the particular reference scenario considered

 

WP300

 

  • Task 301       Activity 1    Fault Detection State Of the Art

review the state of the art of fault detection strategies

 

  • Task 301       Activity 2    Online and Distributed Fault Detection

define strategies for online and distributed fault detection in highly interdependent scenarios.

 

  • Task 302       Activity 1    Online Interdependency Impact Analysis

define strategies for the composition of distributed and partial observations in order to reconstruct the actual working capability of interdependent critical infrastructures.

 

  • Task 302       Activity 2    Online Interdependency Prediction

define strategies for the composition of distributed and partial observations in order to obtain a shared prevision of the working capability of interdependent critical infrastructures.

 

  • Task 303       Activity 1    Intrusion Detection For Scada Systems state of the art

analyze the most diffused intrusion detection methodologies

 

  • Task 303       Activity 2 Intrusion detection for Scada Systems in highly interdependent scenarios

identify methodologies for the intrusion detection in presence of high coupling among the infrastructures and domino effects.

 

WP400

 

  • Task 401       Activity 1 Testbed Requirement Analysis

define the requirements for the Testbed

 

  • Task 402       Activity 1 Testbed  Design

design the functionalities of the testbed

 

  • Task 403       Activity 1 Testbed hardware setup

implement the hardware configuration of the testbed

 

  • Task 404       Activity 1 Testbed Verification and Validation

verify the formal correctness of the software as well as the hardware configuration, and to verify the adequateness of the testbed to represent real attack situations

 

  • Task 405       Activity 1 Testbed experiments

use the testbed in order to provide scientific results on the attack protection strategies considering coupled infrastructures.

 

WP500

 

  • Task 501       Activity 1 Anomaly Detection and cyber threats state of the art

analyze the most diffused  methodologies for Anomaly Detection and cyber threats

 

  • Task 501       Activity 2 Anomaly Detection and cyber threats  in highly interdependent scenarios

identify methodologies for Anomaly Detection and cyber threats in presence of high coupling among the infrastructures and domino effects.

 

  • Task 502       Activity 1 Stealth attacks awareness and reaction strategies state of the art

analyze the most diffused Stealth attacks awareness and reaction strategies

 

  • Task 502       Activity 2 Stealth attacks awareness and reaction strategies in highly interdependent scenarios

identify methodologies for Stealth attacks awareness and reaction strategies in presence of high coupling among the infrastructures and domino effects.

 

WP600

 

  • Task 601       Activity 1 Final Report

provide a comprehensive discussion of the work done

 

  • Task 602       Activity 1    Final Workshop

inform the scientific community on the results of the project

 

  • Task 603       Activity 1 Website

provide a reference for the project and for dissemination purposes

 

 